Business Basics
Home Page


Who is Bill Gaw?
And why should we
listen to him?

 


lean manufacturing principles and techniques training

A training program that gains employee understanding and commitment
Lean Manufacturing Training Program

If you want to get to the top of the latter, forward this Web page to your CEO/HR
Mfg. Mgmt. Development Program

Manufacturing 101 - Part 5 of 7

Part 1  Part 2   Part 3  Part 4  Part 5  Part 6  Part 7



Get Bill Gaw's Lean Manufacturing Book
$15.00 Click Here

 Book: "Back to Basics"

 


privacy policy

987

760-945-5596

Other Training Options:

Lean Sigma Assessment

Lean Six Sigma Implementation

Lean Six Sigma, Certification Program

Lean Six Sigma Forum

Lean Manufacturing Basics

Lean Manufacturing Assessment

Lean Manufacturing Transformation Training

Shop Floor Control

Lean Manufacturing Principles and Techniques

Lean Manufacturing Simulation Game

Lean Manufacturing Certification Program

Lean Manufacturing
Seminars

Kaizen Management Training

Lean Manufacturing Problems and Solutions

Lean Manufacturing Seminar-in-a-Box

Supply Chain Management Training Program

Strategic Planning Training Program

Thinking-Outside-the- Box Workshop

Lean Management PowerPoint Training Modules

Lean Manufacturing
Articles

Lean Manufacturing
Consulting

 

Operation Sequencing

R. L. Lankford implemented in his Otis Engineering plant in Texas, making oil well drilling tools, a finite scheduling technique he called "operation sequencing." His definition was "simulating in advance in our computer the sequence in which manufacturing jobs will flow through the various work centers of the plant." Figure 11 compares proposed actions for work schedules in work center 37 using infinite capacity scheduling and operation sequencing. The uppermost section headed Planned shows three weeks with load/capacity ratios of 120 percent in week 1, 50 percent in week 2, and 150 percent in week 3. The proposed actions are, "Work six days in week 1, work halftime in week 2, and work 10-hour days in week 3." These are feasible if people can be shifted and their work hours varied.

 

The simulated actual data for upstream work centers show that work planned for this work center will not arrive; the revised actions are, "Work halftime in week 1, work a normal schedule in week 2, and work five 10-hour days in week 3." What a difference! Operation sequencing could be run again in week 1 for the next three weeks and repeated each week to get the latest information. This technique was implemented successfully in the early 1970s using homemade software.

PROBLEMS IN EXECUTION

The major problem in execution is unrealistic, overloaded plans. Un­certain demand leads managers to make master production schedules "wish lists" in hopes of getting better customer service. To get new business, large orders are stuffed into already loaded plants. Poor ca­pacity planning fails to alert people to the real problem. Capacity must be adequate for sound planning.

 

Also major problems are data errors and omissions in routings, work standards, and work-in-process. These are the poorest records in in­dustry. Proliferating changes in product designs and processing meth­ods are compounding these problems today. Few are solving these well.

Excessive work-in-process results from lack of effective control of work input and output. This causes long and erratic lead times and poor priority control. A basic manufacturing strategy, "Don't commit flexible resources (i.e., money, materials, machinery, and people) to specific items until the last possible moment" is the core of Just-in-Time activities.

Other problems include late or defective supplier materials and ser­vices, poor quality materials, machine breakdowns, tooling failures, design delays and errors, and poor processing methods. These, long thought to be unavoidable, cause upsets hamstringing execution.

 

At the heart of these problems are under qualified people who don't understand how manufacturing works and how to make it work better. Instead of attacking these problems, they seek a silver bullet in com­puter software. They neglect today's accepted goals of improving cus­tomer service, eliminating waste and non-value activities, zero defects, short lead times, flexibility, supplier and customer partnerships, and teamwork among their people. They view the needed education to fully qualify people as an unaffordable expense.

Continued

Part 1  Part 2   Part 3  Part 4  Part 5  Part 6  Part 7


Bill Gaw's Lean Manufacturing & Six Sigma Bulletin (LMSSB)

To stay current on Lean Manufacturing and Six Sigma knowledge and implementation know-how, subscribe to Bill Gaw's Lean Manufacturing Six Sigma Bulletin and you'll receive his weekly solutions to the reasons why 80% of lean initiatives fail to meet expectations. And as a bonus we'll send you a download copy of our eBook, "Thinking-Outside-the-Box.". (All at no cost of course.).

 Simply fill in your first name and email address and click on the bar below:

        Your personal information will never be disclosed to any third party.

First Name:
Your E-Mail:

Here's what one of our 15,000 plus subscribers wrote about the LMSS Bulletin:

"Great manufacturing articles. Thanks for the insights. I often share portions of your articles with my staff and they too enjoy them and fine aspects where they can integrate points into their individual areas of responsibilities. Thanks again."

               Kerry B. Stephenson. President. KALCO Lighting, LLC


Knowledge and implementation know-how you'll not find in the
books at Amazon.com... neither in the APICS Package 
nor the Harvard Business School Press.  

Business Basics, LLC
6003 Dassia Way, Oceanside, CA 92056
West Coast: 760-945-5596 

© 2000-2013 Business Basics, LLC