Business Basics
Home Page


Who is Bill Gaw?
And why should we
listen to him?

 

lean manufacturing principles and techniques training

Bill Gaw's 3-Step, World Class
Manufacturing Training Program
World Class Manufacturing

Increase the effectiveness of your
Lean Manufacturing Program

Manufacturing Simulation Game 

Project Based Manufacturing
Part 7 of 8


privacy policy

Lean Manufacturing, Basics, Principles, Techniques

For my latest
Goggle.Knol article:
Click Here

 To review Bill's training
 programs, click on 
  the links below: 

Lean Manufacturing Solutions

Performance
Management Training

Production Quality

Supply Chain
Management
Training

Lean Six
Sigma Process

Strategic Planning
Training

World Class Manufacturing

Kaizen Training

     Other Options:   

Manufacturing Simulation Game

Thinking Outside the Box

Implementation, Methodology, and Excellence Improvement Training

Balanced Scorecard Training Program

Kaizen Blitz Event

Lean Manufacturing Operations 

Six Sigma Management

Manufacturing Supply Chain Management

Strategic Planning Management

Quality
M
anufacturing

Lean Management
Certification Program

Lean Manufacturing Seminar

Lean Manufacturing Jobs

Process Improvement Training

Best of Gaw Lean Management Articles

Manufacturing and Procurement (Purchasing)

Life is difficult when you're at the end of a lifecycle that is character­ized by change. The process of discovery means that a certain number of assumptions that the design engineer made will be wrong. This trans­lates into rework. Also, the conflict between getting all the details of a design worked out and documented and the need to maintain schedule often result in incomplete engineering specifications. An item not ad­equately defined is difficult to manufacture either in manufacturing or by a supplier. Compounding the problem is the fact that most of those who make hardware and deliver services are craftspeople in short sup­ply. Their skills in dealing with the ill-defined and the flexibility that results from their skills may in fact be the unprescribed antidote for the undesirable situation they often find themselves in. Unfortunately this antidote is treating a symptom, not the cause.

 

Most of the detail planning, scheduling, and monitoring in manu­facturing and purchasing is done by stand-alone systems. This "islands of information" condition is typical to the company as a whole. Often the system used is a system based on the manufacturing resource plan­ning (MRP II) business model and has been partially enhanced to sup­port the project environment. For those unfamiliar with MRP II, I sug­gest reading this author's paper, "Enterprise Resource Planning (ERP) —An Executive Perspective."3

The key critical business issues:

      frequent schedule changes

      unreliable schedules

      poor accuracy of BOM/product specifications

      poor inventory record accuracy

      too many engineering changes

      inadequate and inaccurate cost accumulation.

Frequent schedule changes—New requirements, rework due to engineering changes, and changes in priority all add up to a "nervous" and frequently changing schedule. Schedules that change frequently are often viewed as unreliable. When you doubt the integrity of the schedule, you make up your own. The situation is compounded by a capacity problem, the shortage of skilled craftspeople. A credible and relatively stable schedule is necessary to build a complex device.

Unreliable schedules—See above.

Poor accuracy of BOM/product specifications—If the BOM is inaccurate, there are only two possibilities: build it, discover it is wrong, and then rework it, or get engineering involved when you discover it is inaccurate and while you are building it. Both choices consume limited and precious resources and time. Remember that there isn't a pool of readily available capacity. If you do not properly utilize the resources you have, you are in trouble.

Poor inventory record accuracy—You think you have it in stock and then you discover you do not. Poor inventory record accuracy is the bane of any firm that assembles a complex device of hundreds if not thousands of parts. Perhaps an engineering change may have made a part in stock unusable and your inventory system does not record or show component revision levels. Also, in the freewheeling ETO envi­ronment, an item often is not processed through the inventory record system. There are many potential causes of inaccurate inventory records.

Too many engineering changes—If the customer has not ad­equately communicated their requirements, there will be changes as the discovery process continues. Sometimes engineers just make mis­takes. The machine being designed and built is complex; there are pres­sures to perform to schedule on a project that may have very little sched­ule reserve. Then there is the possibility of bad habits, releasing a de­sign without a review. Whatever the cause, the number of engineering changes is unacceptably high.

Inadequate and inaccurate cost accumulation—Meeting sched­ule is important, and so is making a profit. To make a profit you must meet or perform better then budget. Under­standing how you are performing is impor­tant to corrective action to stay on budget. Understanding requires accurate information. Accurate information is dependent in part on ease of recording activities and the discipline of those recording it. The problem in part is the islands of information within a company. Another contributor may be the organiza­tional reporting relationships. When I did some research on project accounting, I found that there was no real consistency about which department this function reported to. Sometimes it was finance, engineering, project management, or manufacturing.

To Be Continued


STAY CONNECTED

To stay current on Lean Management Basics and Best Practices, subscribe to our weekly MBBP Bulletin... and we'll send you our PowerPoint presentation, "Introduction to Kaizen Based Lean Manufacturing™." All at no cost of course. 

 

First Name:
Your E-Mail:

 Your personal information will never 
be disclosed to any third party.


privacy policy

Here's what one of our 13,000 plus subscribers
wrote about the MBBP Newsletter:

"Great manufacturing articles. Thanks for the insights. I often share portions of your articles with my staff and they too enjoy them and fine aspects where they can integrate points into their individual areas of responsibilities. Thanks again."

               Kerry B. Stephenson. President. KALCO Lighting, LLC


"Back to Basics" Training for anyone ... anywhere ... anytime

Business Basics, LLC
6003 Dassia Way, Oceanside, CA 92056
West Coast: 760-945-5596 

© 2001-2009 Business Basics, LLC