Business Basics
Home Page


Who is Bill Gaw?
And why should we
listen to him?

 

lean manufacturing principles and techniques training

Bill Gaw's 3-Step, World Class
Manufacturing Training Program
World Class Manufacturing

Increase the effectiveness of your
Lean Manufacturing Program

Manufacturing Simulation Game 

Project Based Manufacturing
Part 2 of 8


privacy policy

Lean Manufacturing, Basics, Principles, Techniques

For my latest
Goggle.Knol article:
Click Here

 To review Bill's training
 programs, click on 
  the links below: 

Lean Manufacturing Solutions

Performance
Management Training

Production Quality

Supply Chain
Management
Training

Lean Six
Sigma Process

Strategic Planning
Training

World Class Manufacturing

Kaizen Training

     Other Options:   

Manufacturing Simulation Game

Thinking Outside the Box

Implementation, Methodology, and Excellence Improvement Training

Balanced Scorecard Training Program

Kaizen Blitz Event

Lean Manufacturing Operations 

Six Sigma Management

Manufacturing Supply Chain Management

Strategic Planning Management

Quality
M
anufacturing

Lean Management
Certification Program

Lean Manufacturing Seminar

Lean Manufacturing Jobs

Process Improvement Training

Best of Gaw Lean Management Articles

Front-End Processes

Understanding enough of the customer's requirements to start design­ing, building, and procuring items is very important in reconciling the conflicting objectives of having an absolutely accurate understanding of the customer's requirements and meeting delivery dates. The phase in which this occurs is often called the "front-end processes." For most companies operating on an ETO basis, this is the most demanding part of the project. The expression "front-end processes" is generally un­derstood to include

     securing a workable requirements definition

     bidding and estimating

     contracts

     preliminary design

     partial engineering release.

Engineer

The engineer in an ETO environment is very involved throughout the life of the project. Also, engineering is more hands-on and involved with the customer, bidding and estimating, project management, con­tracts, manufacturing, and procurement.

 

An engineer working in an ETO environment generally has a good suite of technical tools and systems.

 

Engineering activities are a significant contributor to overall costs and consume a considerable percentage of the overall delivery lead time. In some situations, engineering generates the majority of costs and consumes much of the overall lead time. Since an ETO project is very engineering-centric, resource planning and scheduling of engi­neering is extremely critical. In certain segments of the ETO commu­nity, particularly complex mechanical machinery, there is a shortage of skilled engineers. This situation amplifies the need for constraint man­agement, resource planning, scheduling, and accurate status visibility across the engineering organization.

Since meeting the delivery date is absolutely critical, engineering will often release component and subassembly data to manufacturing and purchasing before the final assembly unit is fully engineered. This means that engineering, manufacturing, and procure­ment work in parallel. Because some of the design re­quirements can and do change, there is typically a steady stream of rework. This situation makes the plan­ning and control of the project more difficult. Most of this is the result of balancing an incomplete require­ments definition with the need to meet delivery due dates. But, some of this is the result of "islands of au­tomation and information." This can be corrected and will be discussed later in this paper.

Manufacturing and Procurement

The manufacturing and procurement phase is an ex­ecution phase. Often the engineering data that is re­ceived and the lead time to deliver are less then ad­equate, particularly near the end of a project. Most sup­pliers and the manufacturing staff are flexible and skilled. Often the manufacturing staff is in short sup­ply and better described as craftsmen, not factory work­ers. The systems used for detailed planning and sched­uling are separate from the project planning system.

Installation

Installation is a demanding and often complex phase. The work takes place in front of the customer, and there is no place to hide! After the initial installation, there may be acceptance testing and changes in the installa­tion. Customer training frequently follows and possi­bly more changes. The design engineer may, depend­ing on the complexity of the equipment, be onsite and involved. Configuration management is critical dur­ing this phase and impacts the ability to supply spare parts and maintenance services in the future. Inaccu­rate configuration records translate into poor customer service and high costs in servicing the equipment in the future. The equipment being delivered is very ex­pensive and important to the customer's ability to build and ship product.

Spares Management and Onsite Support

Although this is not strictly speaking part of the project, it does impact the ability to support current projects. The life span for specialized equipment may be 10 to 40 years or more. This is an incredibly long time to maintain spares and configuration records. If a customer's ma­chine goes down and the required part is not in stock, manufacturing or purchasing must be extremely responsive in delivering the part. This places another demand on limited resources. Feel the tension?

Figure 1 graphically depicts the project lifecycle.

In summary, the combination of uncertainty and the intensified need to deliver on time mandate that a rational, cohesive, and integrated requirement definition, engineering design, planning, control, and cost management framework is in place. We will discuss one later in this paper.

To Be Continued


STAY CONNECTED

To stay current on Lean Management Basics and Best Practices, subscribe to our weekly MBBP Bulletin... and we'll send you our PowerPoint presentation, "Introduction to Kaizen Based Lean Manufacturing™." All at no cost of course. 

 

First Name:
Your E-Mail:

 Your personal information will never 
be disclosed to any third party.


privacy policy

Here's what one of our 13,000 plus subscribers
wrote about the MBBP Newsletter:

"Great manufacturing articles. Thanks for the insights. I often share portions of your articles with my staff and they too enjoy them and fine aspects where they can integrate points into their individual areas of responsibilities. Thanks again."

               Kerry B. Stephenson. President. KALCO Lighting, LLC


"Back to Basics" Training for anyone ... anywhere ... anytime

Business Basics, LLC
6003 Dassia Way, Oceanside, CA 92056
West Coast: 760-945-5596 

© 2001-2009 Business Basics, LLC