Formal Procedures
For the
certification process to be successful it must be a formal process.
This requires that procedures be documented and shared with the
suppliers. It is important that you and your suppliers understand
each parties responsibilities and expectations. Those involved in
each process must be educated and trained. An audit process must
exist to verify compliance to procedures and policies as written and
when necessary changed to meet new expectations. For each written
procedure a flow chart should be constructed and disseminated. If
necessary pictures and diagrams provided to insure standards are
met.
Specific procedures
should include but are not limited to, receiving inspection,
documentation requirements, measurement system, return goods
activities, partnership agreement, de-certification, probation,
packaging and shipping, purchase requisition, order acknowledgment,
expediting, supplier survey, supplier assessment, and new supplier
approval. To facilitate development of procedures generic procedures
can be purchased and modified to meet your requirements.
Measurement System
A measurement
system needs to be designed and implemented to provide performance
data. This system provides information on the ability of suppliers
to meet system requirements and provide objective feedback for
corrective action. The measurement system should be designed around
the elements of the cost ownership model. When measuring and
evaluating a supplier two separate measurement matrixes should be
constructed, one for new supplier selection and one for performance
measurement of an existing supplier. From a cost benefit point of
view it would not make sense to measure approved suppliers on the
same criteria as a senior supplier. A senior supplier is defined as
a supplier who has strategic importance to the organization. Thus a
senior supplier must be measured on more criteria than an approved
supplier. As with the supplier survey each measurement criteria must
be assigned point value and weight. Then point ranges determined for
acceptable, upper and lower control limits. Most likely you will be
required to design and program a measurement system to meet your
needs. The majority of manufacturing packages are some what limited
in their ability to meet requirements of supplier measurement
system. Although some measurement criteria is standard in
manufacturing software; i.e., delivery performance and quality
performance. Feedback forms can be utilized to provide
identification of deficiencies. It is recommended that whatever
system is designed that it be easy to use and maintain. Don't
measure items unless they provide a benefit.
Conclusion
The time frame for
implementation of a supplier certification program vary by company
based resources, number of suppliers and design content of the
supplier certification program. In general you can plan on a one to
five year implementation cycle to bring on line all your suppliers.
It is important to continually conduct a cost/benefit analysis
during the implementation cycle when designing each element of the
supplier certification program. This way you are assured of creating
a workable program. Each company must decide what is right for them.
Because the implementation cycle can extend over a period of time
you will have suppliers in different phases of the supplier
certification program. You must decide from a strategic perspective
which suppliers should come on line first.
A properly conduct
implementation should result in cost savings realized by minimizing
total costs for procurement. Savings will be generated through but
not limited to reduced cost of quality, consistent delivery
performance, increased productivity through improved communication,
reduced variability in delivered products, streamlined systems,
reduction/elimination of non-valued added activities, price
competitiveness, inventory reduction and technology application.